QUESTION 19
Refer to the exhibit.

A customer needs to create a proposal for a full wireless solution for a customer The customer has indicated that the MCs will connect to Aru&a CX Switches at the core and the APs will connect to PoE-i- switches at the edge. The customer requires that the wireless solution support at least 50 Mbps concurrently per AP. The architect has created a BOM tor a Mobility Master (MM), two MC 721os, and 400 AP-535S. me exhibit snows this BOM.
Which components has the architect forgotten?

 
 
 
 

QUESTION 20
A customer has critical wired endpoints. However, each endpoint has a single Ethernet connection to the network. The customer wants redundancy in the switch access layer to minimize the chances that an endpoint will lose this connection The architect plans to deploy two Aruba CX 6405 switches in the closet.
Which plan provides the greatest redundancy for this scenario?

 
 
 
 

QUESTION 21
Compare the scenarios below. For which scenario do AP-575S meet the needs?

 
 
 
 

QUESTION 22
The architect plans to recommend an upgrade to Aruba CX switches
What is one requirement for the new solution that justifies this recommendation?

 
 
 
 

QUESTION 23
A retailer wants to add a wireless network to its stores to provide guest access. The store has wired POS systems which the customer will now replace with wireless systems.
What is one Important security action that the wireless solution supports to comply with PCI DSS?

 
 
 
 

QUESTION 24
Refer to the exhibit.

A customer has these availability requirements;
* loss of one controller with stateful failover and without impact on wireless client connectivity
* loss of one core switch without loss of connectivity for any endpoints or APs in the building
* loss of any one switch-lo-switch or MC-to-switch link without loss of connectivity for any endpoints or APS in the building and with minimal impact on infrastructure functionality
* loss of any one access switch with minimal impact to wireless client connectivity The exhibit shows the current plan for the topology.
Which change should the architect make to the plan to provide better support for the customers availability requirements?

 
 
 
 

QUESTION 25
What is one piece of additional information architects should obtain from the customer before they design the wireless solution?

 
 
 
 

QUESTION 26
A nospltai needs an upgrade to 802.11ax for its wireless network, which needs to provide complete coverage The hospital has a concrete exterior and uses drywalls lor all of the interior walls with a few exceptions as mandated for safety The building has 10fool (3 m) ceilings.
The hospital prefers to avoid the deployment of APs in rooms if possible. Exceptions include reception areas and lounges.
The wireless network must support wireless medical devices, voice communicators for medical star, laptops in nurse stations, medical staff tablets, and visitor and patient personal devices. All of these devices support both the 2.4GHz and 5GHz band.
The exhibits below show one wing of one floor of the hospital. This wing is about 2S.Q0D square feet {2GQQ sq, m). The unlabeled rooms along the bottom of the wing are patient rooms’ other rooms such as lounges and the MR] room are labeled. This area has:
* up to SO concurrent patients and visitors, who might have up to two devices
* 40 concurrent staff members, who might have up to three devices
* about 200 medical and other types of wireless devices
The architect has already planned to place APs in stairwells on another floor.
Which AP plan for this wing of this floor meets the customer needs?
A)

B)

C)

D)

 
 
 
 

QUESTION 27
Refer to the exhibit.


A customer needs a new branch office solution that:
provides 802.11ac wireless access to local resources and the local Internet connection connects wired and wireless users to resources at the main office in a secure manner The office has 200 users, who will the up to two wireless devices at the same time. The architect has determined that the office requires 10-13 AP-
515s. The customer wants to support a total bandwidth from an or me APS or about 2 cops.
The entire site is currently wired for CAT5e from a single wiring closet, which contains two access switches, a core switch, and the Internet cable modem, which has 10/10O/1OQO Mbps BASE-T ports. The wired networK will handle abouti Gbps of traffic. The switches do not support P0E/P0E+.
About 75 percent of all traffic is destined to the main office
The architect has looked up these specs for 7000 series controllers.
Which MC will meet the needs in the most cost-effective manner?

 
 
 
 

QUESTION 28
A network architect plans to propose a virtual Mobility Master (VMM) tor a new solution. The solution will support up to 4.800 wireless client devices and include:
* two Virtual Mobility controllers (VMCs) in a cluster
* 180 APs
Which licenses should the architect propose?

 
 
 
 

QUESTION 29
For which scenario do Aruba CX 6300M Series switches meet the needs for an upgrade of the wired access layer while the Aruba CX 630QF Series switches do not?

 
 
 
 

QUESTION 30
Refer to the exhibit.
A customer has an existing network with ArubaOS switches, Aruba 7205 controller, and 802.11ac APs. The customer needs a wired upgrade for their campus network and wireless upgrade with 802,11ax APs and would like to get all the functions of AP.
The customer has one building with 3 floors with the following wired devices,
* 200 VOIP phones
* 8 printers
* security cameras
The architect plans to propose 75 AP-535s.
The security cameras are a high definition pan-tilt-zoom with heaters for harsh environments that require more than 45 W to function, Which exhibit shows an access switch mat meets the customer needs?
A)

B)

C)

D)

 
 
 
 

QUESTION 31
in which scenario do Aruba CX 6400 Series switches, but not Aruba 6300M Series switches, meet the needs Tor a wired upgrade?

 
 
 
 

QUESTION 32
A mall requires a wireless network upgrade to 802 -Max The company that owns the mall wants to provide the APs for the entire mall. However, several of the larger national chain retailers with spaces in the mall want to offer wireless services with their own SSIDs.
These individual retailers also have their own wireless guest services and wireless client devices They have their own corporate infrastructure and want to handle all of this wireless traffic on their own, including terminating the traffic on their own controllers. The mall requires redundancy for its services, out the retailers do not.
Which plan for mobility controllers (MCs) and mobility master (MW) meets the needs of this scenario?

 
 
 
 

QUESTION 33
A customer requires new MCs for a large multi-site network with about 600 AP-535S ana 30,000 wireless clients. The customer requires redundancy for the MCs, with each MC being able to handle the full toad in a failover situation The network should be able to sustain the loss of a controller with stateful failover within seconds. It should be able to undergo software upgrades without downtime.
The architect has recommended two 7240XM MCs. The customer points out that 7220 MCs can support their requirements and wonders why the architect recommended me 7240XMS.
What should the architect explain?

 
 
 
 

QUESTION 34
Refer to the exhibit.

A customer requires a core switching solution for a very large multi-building campus with about 30;ooo wireless clients and devices. The network will have a flat topology as shown in the exhibit, and MCs will forward all wireless traffic to the core for routing.
The customer had considered Aruba 5400R Series switches, but the architect recommends Aruba S320 switches Instead.
How should the architect justify this recommendation?

 
 
 
 

Updated HP Study Guide HPE6-A80 Dumps Questions: https://www.examcost.com/HPE6-A80-practice-exam.html

         

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

Leave a comment

Your email address will not be published. Required fields are marked *

Enter the text from the image below