Topic 1: Implement additional supply chain management features 10-15% – Configure advanced planning and supplementary functions

  • 1. Vendor rebates and trade agreements
  • 2. Service management and mixed reality integration
  • 3. Master planning and Planning Optimization
  • 4. Use Copilot capabilities in Supply Chain Management
Topic 2: Configure production prerequisites 20-25% – Set up production parameters and resources

  • 1. Define resource groups, capacities, and calendars
  • 2. Configure bill of materials and routes
  • 3. Configure costing versions and valuation methods
Topic 3: Configure products 15-20% – Implement advanced product information management

  • 1. Manage product variants and configurations
  • 2. Configure product attributes and categories
  • 3. Implement engineering change management
Topic 4: Implement production methods 15-20% – Configure and use different production types

  • 1. Lean manufacturing
  • 2. Process manufacturing
  • 3. Discrete manufacturing
Topic 5: Configure production control 20-25% – Manage production lifecycle and operations

  • 1. Manufacturing execution and shop floor control
  • 2. Subcontracting and outsourced operations
  • 3. Production costing and variance analysis
  • 4. Production scheduling and capacity planning

 

NEW QUESTION 43
You need to configure the requirements for metal fabrication equipment maintenance. What must you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

NEW QUESTION 44
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to It. As a result, these questions will not appear in the review screen.
A manufacturing plant uses Lean processes. You plan to outsource a painting operation to a subcontracting vendor. You create a service item named SP-01 to represent the painting service.
You need to create a subcontracting activity for the painting service.
Solution:
* Create a purchase agreement for the subcontracting vendor and add SP-01 as the painting service.
* Create a vendor resource then create a work cell for outsourced painting and add the resource to the work cell.
* Create a production flow process activity for the painting work cell and add the component to be painted as a picking activity.
* Create a server term to tie the purchase agreement to the activity.
Does the solution meet the goal?

 
 

NEW QUESTION 45
You need to plan scheduling for Customer1’s order of unscented solution.
What are two possible ways to achieve the goal? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.

 
 
 
 
 

NEW QUESTION 46
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A manufacturing plant uses Lean processes. You plan to outsource a painting operation to a subcontracting vendor. You create a service item named SP-01 to represent the painting service.
You need to create a subcontracting activity for the painting service.
Solution:
* Create a purchase agreement for the subcontracting vendor that contains the pricing information for SP-01.
* Create a vendor resource and a work cell for outsourced painting, then add the resource to the work cell.
* Create a production flow process activity using the painting work cell and the service item as the picking activity.
* Create a service term on the activity to tie the purchase agreement to the activity.
Does the solution meet the goal?

 
 

NEW QUESTION 47
A manufacturer is implementing master planning in Dynamics 365 Supply Chain Management for planned orders.
Master planning is running for the first time in the production environment.
You need to instruct the production planners where to view the following information:
* Planned orders that are created in a run.
* An item’s planned orders against the demand over user-defined periods of time.
In which two possible locations can the information be found? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.

 
 
 
 
 

NEW QUESTION 48
A discrete manufacturer uses the time and attendance registration for production operations.
All employees register daily clock in and clock out times during a 40-hour. Monday through Friday workweek.
Pay periods are every two weeks. Workers are paid hourly.
The production manager will create work schedules with the following windows:
* Mandatory work hours
* Work hours during which employees can leave early without accruing absences
* Work hours during which employees can work extra time
If a junior production worker works over 90 hours in a pay period. the worker will receive lime and a half over
80 hours. If a senior production worker works over 90 hours in a pay period, the worker will receive double time over 80 hours.
Vou need to configure the system for these requirements.
Where should you configure this functionality? To answer, drag the appropriate forms to the correct requirements. Each form may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

NEW QUESTION 49
A manufacturer is implementing Dynamics 365 Supply Chain Management to create blends of oil and industrial lubricant.
The manufacturer requires detailed documentation for the production order process before manufacturing begins for the products. The shop floor must review, approve, and anticipate all production runs. Before production starts, the manufacturer wants to ensure that the order can be completed by a certain timeframe based on capacity.
You need to define the production life cycle stages.
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

NEW QUESTION 50
You are the production scheduler for a manufacturing company. You have run the Resource Group Capacity report as shown in the Resource Group 21 Capacity exhibit. (Click the Resource Group 21 Capacity tab).

After reviewing that report, you run Resource Capacity reports as shown in the Resource 2101 and 2102 Capacity exhibits. (Click the 2101 Capacity and 2102 Capacity tabs.)

You run the Gantt chart report as shown in the Gantt exhibit to determine the production orders scheduled on the resources. (Click the Gantt tab.)

You need to determine the method to schedule the production lines.

For each of the following statements, select Yes if the statement is true. Otherwise, select No.
NOTE: Each correct selection is worth one point.

NEW QUESTION 51
A Discrete manufacturing company produces speakers. The high-end speaker model uses protective rubber strips on the edges.
Approximately five inches of rubber is consistently scrapped in the production process, regardless of production quantity. Workers manually consume the extra material on the picking list or scrap it in an inventory journal.
You need configure the system to automatically account for this scrap on the Bill of materials (BOM).
What should you do?

 
 
 
 

NEW QUESTION 52
A manufacturing company uses Dynamics 365 Supply Cham Management The company operates three eight-hour shifts per day. Monday through Friday.
The company purchased equipment for a new process that cannot be performed with easting equipment. This specialized equipment performs only this unique task. The machinery must always be monitored and controlled by a worker.
The machine must be added to the existing production line and be ready as soon as possible. Future planned production orders must not overload the running maximums of the new machine.
You need to configure the system.
Which four actions must you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

NEW QUESTION 53
You need to configure the production requirements of the controller.
What should you configure? To answer, move the appropriate configurations to the correct requirements. You may use each configuration once, more than once, or not at all. You may need to move the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

NEW QUESTION 54
A company implements Dynamics 365 for Finance and Operations. You must use functionality in the system for group production runs to prevent downtime and excessive cleaning of the machines on the production line.
You need to set up the system.
Which behaviors should you expect? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

NEW QUESTION 55
A company implements Dynamics 365 Supply Chain Management.
You run a master plan each week.
You need to resolve the issue in the scenario.
What should you do? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

NEW QUESTION 56
Note. This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company implements Dynamics 365 Supply Chain Management and configures the system to support process manufacturing.
The company manufactures pain-relieving lotions. Several of the primary ingredients are delivered at different concentrations depending on the ingredient and vendor. IngredientA is the primary active ingredient in the lotion. IngredientB is used as a compensating ingredient You need to ensure that the system is set up to support the manufacturing process.
Solution: Configure the catch weight of IngredientA to allow for the variances of the concentrations received from the different vendors.
Does the solution meet the goal?

 
 

NEW QUESTION 57
You are the quality assurance manager of a pharmaceuticals company.
One of your customers has requested to only receive batches of item B0001 that have an acid concentration between 5.5 – 10.5 percent.
You need to set up the customer specific batch attribute to track percent acid for B0001.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

NEW QUESTION 58
A company uses Discrete manufacturing concepts to produce cables. The company’s production scheduler uses internal documents to track issues on in-process production orders.
The production scheduler must group all in-process production orders according to issues. The scheduler must be able to easily determine issues with production orders.
You need to implement a method to easily identify production orders with issues.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

NEW QUESTION 59
You are responsible for training the operations staff on production transactions in Dynamics 365 Supply Chain Management. The company uses backflushing for material consumption principles.
You need to train the operators on how to report unintended scrap.
What are two possible ways to achieve this goal? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.

 
 
 
 

NEW QUESTION 60
You need to configure the system to track the cost and delivery performance of VendorZ.
Which two actions should you perform? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.

 
 
 
 

MB-335 Exam Dumps For Certification Exam Preparation: https://www.examcost.com/MB-335-practice-exam.html

         

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

Leave a comment

Your email address will not be published. Required fields are marked *

Enter the text from the image below